NPC Reference Visual Reference by AEDO Construction · RA 1378
NPC 2000
🏠 Introduction
Chapters
📋 01. Administration 📖 02. Definitions ⚙️ 03. General Regulations 🚿 04. Plumbing Fixtures 🔎 05. Inspection & Testing 💧 06. Water Supply 🚽 07. Excreta Drainage System ↪️ 08. Indirect & Special Wastes 🌀 09. Vents & Venting 〰️ 10. Traps & Interceptors 🌧️ 11. Storm Drainage 🏚️ 12. House Drains & Sewers 🔗 13. Joints & Connections ⚖️ 14. Quality & Materials 🪣 App. B. Private Sewage Disposal 🚒 Ref. Fire Protection Systems
Tools
✅ Compliance Checklist
More
📱 AEDO Apps 🏗 AEDO Main Site
Live: Chapters 1–14 · RA 1378 · NPC 2000 Edition
📐 National Plumbing Code — Philippines

NATIONAL PLUMBING CODE Philippines · RA 1378

The Revised National Plumbing Code of the Philippines governs all plumbing work in the country. This visual reference breaks down each chapter into clear rules, key dimensions, and illustrated diagrams — making the code readable for master plumbers, architects, civil engineers, and building officials.

📋 14 Chapters 📖 200+ Definitions 📏 Pipe Sizing & Grades 🔒 RLMP Requirement
NPC 2000 Coverage

Visual references for Philippine plumbing compliance — covering permits & RLMP requirements, pipe grades & fittings, water supply sizing, excreta drainage & DFU, vents & venting, traps & interceptors, septic tanks, storm drainage, and more — all based on RA 1378, NPC 2000 Edition.

Based on the Revised NPC (2000 Edition) under Republic Act No. 1378. Always verify against the official code for permit submissions.

14 Code
Chapters
2%
Min Drain
Grade ≤75mm
RLMP
Permit
Requirement
50mm
Min
Trap Seal
6 SETS
Plans per
Permit App.
⚠  WHY IT MATTERS

Why NPC Compliance Matters

Missing an NPC requirement can directly cause:

Permit application rejected by the Building Official
Failed plumbing inspection — project delays
Costly construction rework & material waste
Legal liability for the Registered & Licensed Master Plumber
Substandard drainage, venting, or water supply systems
Public health & safety code violations

AEDO simplifies complex NPC requirements into practical visual references for real construction projects — and provides expert plumbing engineering services when you need professional support. Contact AEDO →

All Chapters
Live
01
Administration
Sections 100–108 · 9 Sections
  • Permit requirements & who can apply
  • Plans signed & sealed by RLMP (6 sets)
  • Inspection types & inspector qualifications
  • Connection approval — permanent & temporary
Read Chapter →
Live
02
Definitions
Sections 201–202 · 200+ Terms
  • Searchable glossary of all plumbing terms
  • Trap, trap arm, trap seal defined
  • Drainage, vent & supply system terms
  • Fixture unit, branch interval, grade
Read Chapter →
Live
03
General Regulations
Sections 301–314 · 14 Sections
  • Pipe grade: 2% for ≤75mm, 1% for >75mm
  • Acceptable fittings for direction changes
  • Rodent proofing at pipe penetrations
  • Approved pipe materials & standards
Read Chapter →
Live
04
Plumbing Fixtures
Sections 401–411 · 11 Sections
  • Fixture material & surface requirements
  • Clearances: 750mm front, 150mm side (WC)
  • Floor drain trap seal & strainer standards
  • Minimum fixtures by occupancy — full table
Read Chapter →
Live
05
Inspection & Testing
Required Inspections & Tests
  • Rough-in & final inspection stages
  • Water test & air test on the DWV system
  • Maintenance & existing construction
  • Health & safety responsibilities
Read Chapter →
Live
06
Water Supply
Potable Supply & Distribution
  • Cross-connection control & air gap requirements
  • Pipe sizing by Water Supply Fixture Units (WSFU)
  • PRV required when pressure > 551 kPa
  • Shower/tub control valve max 48.88°C
Read Chapter →
Live
07
Excreta Drainage System
Sanitary Drainage
  • DFU values for every fixture type
  • Horizontal branch & stack sizing tables
  • Building drain sizing by grade
  • Changes of direction & cleanouts
Read Chapter →
Live
08
Indirect & Special Wastes
Indirect Waste, Wet-Vented & Special Wastes
  • Air gaps & air breaks for indirect waste
  • Food, sterile & clear-water equipment
  • AC condensate & clothes-washer standpipes
  • Swimming pool & refrigeration wastes
Read Chapter →
Live
09
Vents & Venting
Vent Piping
  • Why venting protects trap seals
  • Max trap-to-vent distances
  • Individual, wet, common & circuit vents
  • AAV rules & yoke vents for high-rise
Read Chapter →
Live
10
Traps & Interceptors
Traps, Cleanouts & Interceptors
  • Trap seal depth: 50–100mm required
  • Prohibited traps (S-trap, drum, running)
  • Grease, oil & sand interceptors
  • Backwater valves for below-grade drainage
Read Chapter →
Live
11
Storm Drainage
Sections 1101–1110 · 10 Sections
  • Roof drain sizing by rainfall intensity
  • Leaders, conductors & area drains
  • Storm & sanitary separation requirement
  • Subsoil drainage & sump pumps
Read Chapter →
Live
12
House Drains & House Sewers
Sections 1201–1212 · 12 Sections
  • Public-sewer connection & 61m availability rule
  • Materials, under-slab & 1.5m/0.6m clearances
  • Min 102mm size & 2% slope matrix (Table 12-2)
  • Water-pipe trench isolation & abandoned sewers
Read Chapter →
Live
13
Joints & Connections
Sections 1301–1308 · 8 Sections
  • Gas/watertight joints & reaming
  • Caulked, threaded, wiped, soldered & solvent joints
  • Connecting dissimilar materials (adapters/unions)
  • Slip/expansion & prohibited joints
Read Chapter →
Live
14
Quality & Weights of Materials
Materials & Referenced Standards
  • Factory marking & material quality (Table 14-4)
  • Copper types & color-stripe codes (K/L/M/DWV)
  • Ferrule & bushing tables (14-1, 14-2)
  • Closet rings, cleanouts & drainage valves
Read Chapter →
Live
B
Appendix B — Private Sewage Disposal
Septic Tanks & Absorption Fields
  • Septic tank sizing by fixture-unit load
  • Setback distances from structures & wells
  • Absorption field design & soil percolation
  • Dosing chambers & subsurface disposal
Read Appendix →
Live
🚒
Fire Protection Systems
Reference · FDC, PIV & Standpipes
  • Fire Department Connection (FDC) & Siamese
  • Fire Hose Connection (FHC)
  • Post Indicator Valve (PIV)
  • FDC for standpipe Classes I–V
Open Reference →
🏗  REAL CONSTRUCTION EXPERIENCE

Beyond the Code — We Actually Build

AEDO Construction doesn't just explain NPC requirements. We apply them in actual projects — from permit drawings to site turnover.

Permit-ready plumbing plans (RLMP-signed)
NPC code compliance review
Drainage grading & pipe sizing
Septic tank design & setback compliance
Water supply & distribution planning
Sanitary drainage system design
Vent piping layout & AAV application
Construction supervision & inspections

From planning to actual construction — NPC-compliant, permit-ready, and buildable.

⚠  AVOID COSTLY ERRORS

Common NPC Mistakes in Construction

Insufficient drain gradeBelow 2% for pipes ≤75mm — fails inspection.
Wrong trap seal depthOutside 50–100mm required range.
Prohibited trap types usedS-traps, drum traps, running traps — banned.
Missing vent connectionsUnvented traps lose seal, cause sewer gas.
Incorrect septic setbacksTank placed too close to wells or structures.
Plans not signed by RLMP6 sets required for permit — unsigned = rejected.

AEDO provides visual references and practical guidance to help you avoid costly NPC compliance mistakes on-site.

📱  PROFESSIONAL ENGINEERING TOOLS

Engineering Tools for Real Construction Workflows

AEDO Engineering Apps are built for Philippine construction — by engineers, for engineers, contractors, estimators, and project managers.

Unit Cost Analysis
Construction Monitoring
S-Curve Tracking
Receipt Scanner
Project Documentation
Progress Monitoring
Cost Forecasting
Site Management Tools
✓  TRUSTED BY PROFESSIONALS

Why Professionals Use AEDO

Real-world construction experience
Philippine code-focused references
NPC 2000 aligned visual guides
Engineering-based practical approach
Free reference, no signup required
Mobile-ready for on-site use
Built for Philippine construction workflows
📞  NEED NPC-COMPLIANT PLUMBING ENGINEERING?

Need Help With NPC Compliance?

Whether you're preparing permit documents, reviewing plumbing plans, designing drainage systems, or verifying code requirements — AEDO can help simplify the process.

Plumbing Plans NPC Code Review Drainage Design Permit Processing Site Supervision Engineering Apps & Tools
BUILD WITH THE TEAM THAT WROTE THE REFERENCE

Need a structure that's code-compliant by design?

This NPC reference is built and maintained by AEDO Construction OPC — a Philippine design-build firm where every plumbing drawing meets NPC 2000, NSCP 2015, and the Fire Code before it ever reaches your site. Engineers, architects, and own-tool builders under one roof.

14+
NPC Chapters
2021
Established
100%
NSCP-Compliant
2
In-House Engineering Apps
⚙  CORE SERVICES

Design & Build · End-to-End

From blueprint to turnover — one accountable team, one contract, one fixed price.

📐

Design Plans, Drawings & Specs

Architectural floor plans, plumbing drawings, structural plans, and BOQ — drawn against current code from day one.

  • Plumbing & sanitary plans
  • Structural drawings (NSCP 2015)
  • Bill of quantities
🔨

Construction & Management

Full-scope construction & project management for architectural, structural, and interior fit-out — delivered safely, on schedule.

  • Architectural construction
  • Structural works
  • Interior fit-out
📱  ENGINEERING APPS WE BUILT

Mobile Tools for the Field

Purpose-built Android apps used by engineers, contractors, and students nationwide.

Bx
BuildX NSCP Kit
v1.0 · Android

Full NSCP 2015 reference: minimum design loads, wind calculator (§207A-207B), seismic base shear (§208), concrete, steel & foundation design — all in your pocket.

⚖ Loads 💨 Wind 🌏 Seismic 🧱 Concrete 🔩 Steel 🏗 Foundation
Get the App →
Unit Cost Analysis
v1.0 · Android

Estimate construction unit costs with editable material, labor, equipment & productivity rates. 10+ activities from excavation to gates — calibrated to local Philippine market prices.

₱ Calculator 🧱 Materials 👷 Labor 🚜 Equipment 📊 Productivity
Get the App →
Ready to build NPC-compliant?
Let's talk through your project — plumbing plans, site assessment, structural review, or full design-build.
📞Contact 📱Apps BP344